Skip to content

Flex in Action

Illustrative workflow

AI-assisted empty container repositioning. How many, when and where.

Flex combines vessel and voyage data, empty stock and booking forecasts to show where empty containers will run short or pile up, by location and container type. It ranks the moves that fix it. Your planners approve every move before it is created.

Imbalance forecast · Next 14 days

Illustrative values
LocationTypeBalance
Depot A40' HC
+36 Surplus
Terminal B40' HC
−22 Shortage
Depot C20' DV
−9 Shortage
Terminal D20' DV
+14 Surplus

Ranked move 1

How many?
22 × 40' HC
When?
Departs day 3, arrives day 6
Where?
Depot A to Terminal B
The planner approves before the move is created

Empty stock by location, Booking demand, Expected empty releases, Minimum stock, Shortages and surpluses, Ranked moves

The workflow

From operational data to approved moves.

Empty container repositioning is one of the ten maritime workflows in Flex in Action. Four steps on one record, with the planner deciding at the end.
  1. 01Step 1

    Connect the data

    Vessel and voyage data, AIS positions, empty stock by location and booking forecasts come together on the Flex Run record.

    • Flex Run
    • Flex Connect
  2. 02Step 2

    Forecast the balance

    Flex Intelligence projects stock by location, type and date, and calculates shortages and surpluses against minimum stock.

    • Flex Intelligence
  3. 03Step 3

    Recommend moves

    Ranked repositioning options: how many, when and where, weighing capacity, lead time and cost.

    • Flex Intelligence
  4. Step 4

    Review and execute

    Planners review quantities, timing and destinations in the planning view. Approved moves are created in Flex Run.

    • Flex Performance
    • Flex Run
    Who decides

Connect the data

Empty container management starts with the right data.

A good repositioning decision needs three things side by side: where the vessels are, where the empty containers are, and where the next bookings need them.

Vessel and voyage data

Flex Connect

  • Schedules and ETAs
  • AIS positions
  • Full and empty containers on board

Empty stock by location

Flex Run

  • Available quantity
  • Container type
  • Minimum stock by location and type

Bookings and booking forecasts

  • Demand
  • Container type
  • Required date

Flex Run on Dynamics 365 holds the record. External AIS data comes in through Flex Connect, the same feed behind vessel visibility with AIS positions and ETAs.

A reach stacker places an empty container on a waiting truck at an inland container depot with rows of stacked empty containers.

Empty container repositioning

How many, when and where.Your planners approve every move.

Forecast the balance

Forecasting container imbalance by location and type.

Flex Intelligence projects the stock of every container type at every location, date by date. Where projected stock falls below what is required, you see a shortage before it hits a booking.

How the balance is calculated

ImbalanceProjected available stockRequired stock

Required stock includes demand and a minimum stock buffer.

  • Project stock

    By location, container type and date.

  • Combine the inputs

    Bookings, booking forecasts, vessel arrivals and empty releases.

  • Expected empty releases and turnaround time

    Vessel arrival timing and depot and terminal turnaround decide when an empty container is really available again.

  • Shortages and surpluses

    Calculated against the minimum stock you set per location and type.

Worked example

Illustrative values

Terminal B, 40' HC, day 6

Empty stock on hand
18
Expected empty releases
+ 12
Projected available stock
30
Booking demand
40
Minimum stock buffer
+ 12
Required stock
52

Imbalance (Shortage)

−22

Recommend moves

Ranked container repositioning moves: how many, when and where.

Flex Intelligence turns the forecast into ranked scenarios that move empty containers from surplus to shortage locations. It proposes; it does not move a container. Read more about AI for maritime planning in Flex Intelligence.
  • How many?

    The quantity to move, per container type.

  • When?

    Departure and arrival dates, in time for the demand.

  • Where?

    From a surplus location to a shortage location.

Each option is weighed on

  • Capacity on the vessel or route
  • Lead time to the shortage location
  • Cost of the move

Minimum stocks and service levels are respected.

Ranked scenarios

Illustrative values
  1. 1

    22 × 40' HC · Depot A to Terminal B

    Departs day 3, arrives day 6

    Covers the shortage before demand peaks

  2. 2

    9 × 20' DV · Terminal D to Depot C

    Departs day 4, arrives day 5

    Keeps Depot C above minimum stock

  3. 3

    22 × 40' HC · Depot A to Terminal B

    Departs day 7, arrives day 10

    Alternative: lower cost, later arrival

Review and execute

The planner approves. Flex Run executes.

Repositioning advice is only useful if the people who own the equipment plan trust it. So nothing moves without a planner: Flex shows the reasoning, the planner decides.

  1. The planning view in Flex Performance

    Imbalances by location and type, with the recommended moves and their alternatives side by side.

  2. The equipment planner

    Reviews quantities, timing and destinations, and approves the moves to create.

  3. Flex Run on Dynamics 365

    Creates the approved repositioning moves and carries them through execution, on the same record.

Equipment planner at a laptop by an office window, looking out over an empty container depot where a reach stacker lifts a container

Container operators and lessors can see the wider picture under shipping container management software; carriers and liner operators under shipping line software.

See how ports, terminals and shipping lines work with Ultimate in our customer stories. The repositioning flow on this page is illustrative.

Questions

Empty container repositioning, answered.

01

What is empty container repositioning?

Moving empty containers from locations with more than they need to locations where upcoming bookings need them. Trade flows are rarely balanced, so some ports and depots build up empties while others run short. Repositioning decides how many containers of which type move, when and where.

02

How is container imbalance calculated?

Imbalance is projected available stock minus required stock, per location, container type and date. Projected available stock includes empty stock on hand plus expected empty releases, taking vessel arrival timing and depot and terminal turnaround into account. Required stock includes booking demand and a minimum stock buffer.

03

What data does AI-assisted container repositioning need?

Vessel and voyage data (schedules, ETAs, AIS positions and full and empty containers on board), empty stock by location and type with the minimum stock you set, and bookings and booking forecasts with their container types and required dates. Flex Run holds the record on Dynamics 365; external AIS data comes in through Flex Connect.

04

Does the AI decide which containers move?

No. Flex Intelligence calculates the imbalance and proposes ranked options, weighing capacity, lead time and cost while respecting minimum stocks and service levels. Planners review quantities, timing and destinations in the planning view, and only approved moves are created and executed in Flex Run.

Bring one process.

A claim, an invoice flow or a port call you handle every week. We show how it runs in Flex and where it costs you time today.